+7 (212) 674-25-10

© 2021 Larson. All Rights Reserved.
Development by Paul Studio

Office Building for Teleperformance Greece

  • Type
    Commercial
    Office Facility
  • Location
    Mournies, Chania
  • Building
    Double multi-level
    office structure
  • Size
    Indoor Area: 500m²

At a glance

A two floor commercial office building developed by Hellenic Homes to serve as its primary operational workspace in Chania. The facility accommodates architectural planning, construction management, administrative functions and client meetings, supporting the company’s day to day activities under one roof. The first floor also hosts the offices of Ble Collection, further integrating the company’s hospitality operations within the same premises.

The reinforced concrete structure was designed with emphasis on energy efficiency, thermal insulation and functional layout. Internal layout planning allows flexible use of space across both levels, enabling a clear separation between work areas, meeting zones and shared facilities. A dedicated elevator is provided for visitors with disabilities.

All mechanical, electrical and plumbing installations were executed by Hellenic Homes, along with the full interior fit out and exterior access works. The design prioritises stable indoor climate, acoustic comfort and lighting quality, ensuring a consistent working environment throughout the year.

The building integrates durable materials, green elements and carefully planned circulation, resulting in a professional workspace aligned with the company’s architectural identity and long term operational needs.

Hellenic Homes offices
HH office 7

Office Building for Teleperformance Greece

Panoramic location Hellenic Homes

Location

Located in Mournies, within the extended urban area of Chania, the facility benefits from direct access to primary road connections and nearby local infrastructure.

Its position supports efficient daily operations while remaining closely linked to the wider commercial and residential fabric of the city.

Office Building for Teleperformance Greece

Main Parameters

  • The structure was built with reinforced concrete for long term durability

  • Mechanical electrical and plumbing installations were integrated into the building design

  • A centralised HVAC system was installed for stable indoor climate control

  • Sound insulation materials were used to reduce operational noise levels

  • Interior layouts allow future spatial reconfiguration if required

  • Lighting was designed to support extended daily office use

  • Break zones and sanitary facilities were included for staff use

  • The building is equipped with structured cabling and IT ready points

  • Access areas and exterior surfaces were built for continuous use

  • Circulation routes were designed for safe and efficient movement

Learn more about Teleperformance Greece and its national operations.